There are many types of vapor barriers including pvc.
Vapor barrier on slab before hardwood.
Completely tape to pipe and vapor barrier.
Tape all the seams to adhere the repair piece to the existing vapor barrier.
Should a vapor barrier always be used in this scenario.
No need to bother with large fold out low quality off spec construction grade films which can be bothersome and hard to use before the floor is installed.
Preventing the moisture from seeping up into the hardwood requires the installation of a vapor barrier also called a moisture barrier.
Try cutting a 12 inch by 12 inch.
We are talking about a glue down install of engineered wood over an on grade slab.
Vapor barriers are used because while fresh concrete is poured wet it s not supposed to stay that way.
Underlayment with 6 mil vapor barrier.
If the vapor barrier gets damaged before the concrete pour it must be repaired.
It needs to dry and then stay dry to avoid flooring problems.
First vapor barrier on the concrete slab one of companies always uses a vapor barrier flooring vinyl on all their jobs.
Cut another piece of vapor barrier material large enough to cover the damaged area by a minimum of 6 inches on all sides.
Concrete tends to wick water quickly and the barrier holds back most of the moisture.
Builders typically lay down a vapor barrier before they pour a concrete slab.